INSULATION

We provide professional advices and work regarding insulation problems you may face with your house or building,Our company’s crew uses quality interseal products and plastomer :

Stage 1
Wash thoroughly with high pressure pump (100 atmospheres) the concrete, to clean outmold, dirt or other impurities, even if the ceiling is new. After getting the right  form you have to wait to dry.During Summer it  needs up to  20 hours (about 3 -4 days) and during Winter ,accordingly.

Stage 2

Mix the material with electrical mixer. Apply the insulation material on  the roll  and start painting until the horizontal portion on the parapets. Finally, we should have the result. Wait 18-20 hours to dry out the first paint coat and after starting the second coat  (next day). If there are iron columns on the ceiling, they  should be painted 15 -20 cm

Stage 3

Before you go up the  roof, we put bags on our shoes to prevent transfer of dirt and to loosen the insulating material. After the red insulation paint coat is very easy to discern the flaws that exist. To close the seal must use sealant (mastic).

Stage 4

After we finish closing the cracks, we  move to second layer of insulation. We need to use a brush for difficult areas for the roll (pipes, drains, iron columns, tanks and foundations ) for better insulation .

Please note that the insulation material is the same in two colors, the reason for the different colors is  to stand out and be easier and more accurate placement of the applicator (100% overlap). It also helps identify the wear of the last layer, which should always be white.

  •